It should be noted that a Brenner and Brenner was a alternate one -way due to ongoing works. This restriction on traffic will come into force from the 09:00 on March 17 and will end at the 17:00 on March 21, 2025 , affecting the stretch between the crossing the Berzigala and the Maranello crossroads .
It is important to pay maximum attention while driving in these areas, respecting the signs and the indications provided by road operators. Drivers are invited to maintain a moderate speed and to take into consideration possible slowdowns.
details of the current situation:
- Road interested: SS12 of Abetone and Brenner
- Restriction type: alternate one -way
- period of validity:
- Begin: March 17, 2025, 09:00
- End: March 21, 2025, 17:00
- section involved: between the Berzigala and cross the Maranello crossing
We recommend to all motorists to plan their journey in advance and to consider alternative routes if possible, in order to reduce inconvenience and increase road safety in the area.
(source: CCISS; image for illustrative or repertoire purposes)