Starting at 12:00 on 16 December 2024 and until 20:00 on 31 March 2025, the SS106 Jonica will have a reduced carriageway at the height of the Bucchi intersection. During this period, significant restrictions will be in place to ensure the safety of the work in progress.

A circulation ban is planned for vehicles exceeding 3.5 tonnes in weight or a width of 2.80 metres. This measure has been adopted to facilitate maintenance operations and ensure the safety of drivers and workers.

Motorists are advised to plan their journeys taking these restrictions into account and to take alternative routes when possible.

Intervention details:

  • Road affected: SS106 Jonica
  • Location: Bucchi intersection
  • Intervention period:
  • From 12:00 on 16 December 2024
  • Until 20:00 on 31 March 2025
  • Restrictions:
  • Circulation ban for vehicles over 3.5 tonnes
  • Circulation ban for vehicles over 2.80 meters wide

It is recommended to follow the temporary signs and respect the instructions provided by the competent authorities.



(source: cciss ; image for illustrative or stock purposes)