On the SS448 Di Baschi there are significant traffic disruptions due to work in progress. A lane has been closed between the 2.346 kilometer, shortly after the Acqualoreto intersection, and the 5.59 kilometer, before the Ponte Rio intersection, which connects with the SS3 Bis and the SS79 Bis Orvietana.

All motorists are advised to pay particular attention to signs and follow temporary indications to ensure everyone's safety.

The closure details are as follows:

  • Affected section: SS448 Di Baschi
  • Lane closed: Yes
  • From: 2.346 km after Acqualoreto Crossroads
  • To: 5.59 km before Ponte Rio Crossroads
  • Connected roads: SS3 Bis and SS79 Bis Orvietana

It is advisable to plan alternative routes and travel with caution in the work area.



(source: cciss ; image for illustrative or stock purposes only)