On the SS16 Adriatica, maintenance work is reported that will involve a reduction of the carriageway. The work will begin at 22:00 on 16 December and will end at 06:00 on 20 December 2024.

This construction site is located between the Bari/Svincolo per Raccordo con Tangenziale Bari intersection and the Bari/Svincolo SS271 di Cassano intersection. During this period, motorists are advised to pay attention to signs and respect speed limits.

Please plan alternative routes if possible to avoid congestion.

Details:

  • Affected section: SS16 Adriatica
  • Work period: from 22:00 on 16 December to 06:00 on 20 December 2024
  • Location: between Bari Crossroads/Junction for Connection with Bari Ring Road and Bari Crossroads/Junction SS271 di Cassano
  • Type of work: Maintenance work with lane reduction

Remember to travel with caution and carefully follow temporary road signs.



(source: cciss ; image for illustrative or stock purposes only)