On the SS 726 Tangenziale di Cesena, road resurfacing work is underway, which will involve a reduction in the carriageway. The work will begin at 09:00 on 25 November 2024 and will end at 18:00 on 21 December 2024. The restrictions will affect the section between km 0+000 and km 9+513, with alternating directions.
This situation could cause traffic slowdowns and congestion. It is therefore advisable to pay maximum attention and, if possible, plan alternative routes during the work period.
Work details:
- Road affected: SS 726 Cesena ring road
- Type of intervention: Road resurfacing
- Work start: November 25, 2024 at 09:00
- Work end: December 21, 2024 at 18:00
- Section affected: km 0+000 - km 9+513
- Direction: Alternate
Motorists are advised to remain vigilant and follow the instructions provided by road signs to ensure everyone's safety.
(source: cciss ; image for illustrative or stock purposes)