A significant reduction in the carriageway has been announced on the SS268 Del Vesuvio due to work in progress. This work will begin at 08:00 on 23 September 2024 and will continue until 18:00 on 31 December 2024. The carriageway reduction will affect the section between the Incrocio S.Giovanni A Teduccio - SS18 Tirrena Inferiore and the Incrocio Scafati.

All motorists are advised to pay particular attention and follow the instructions provided by road signs. It is advisable to anticipate possible slowdowns and, where possible, to look for alternative routes to avoid congestion.

Details of the intervention:

  • Road involved: SS268 Del Vesuvio
  • Type of intervention: Reduction of carriageway for works
  • Period of works: From 08:00 on 23 September 2024 to 18:00 on 31 December 2024
  • Section involved: Between Incrocio S.Giovanni A Teduccio - SS18 Tirrena Inferiore and Incrocio Scafati

Please drive carefully and respect the speed limits near the construction site.



(source: cciss ; image for illustrative or stock purposes only)