There are significant changes to traffic along the SS85 Venafrana due to work in progress. Starting from 07:30 on 14 October 2024 until 17:00 on 15 November 2024, a lane reduction will be imposed at the S. Nazzaro intersection, in the direction of Agapito intersection.

These works could cause slowdowns and disruption to traffic. To ensure road safety, drivers are advised to pay maximum attention and follow the instructions provided by temporary signs.

Details of the intervention:

  • Start date: October 14, 2024 at 07:30
  • End date: November 15, 2024 at 17:00
  • Location: SS85 Venafrana, Incrocio S. Nazzaro
  • Direction: Incrocio Agapito
  • Type of intervention: Reduction of carriageway

It is advisable to plan any alternative routes and to take into account the possibility of heavy traffic in the area during the period of the works.



(source: cciss ; image for illustrative or stock purposes only)