There are important changes to the traffic flow on the SS26 Della Valle D'Aosta. Due to work in progress, a one-way system will be established that will affect the road from 07:30 on 11 November until 18:30 on 30 November 2024.

This situation will occur between the Pre St Didier intersection and the La Thuile intersection. Drivers are advised to pay particular attention and follow the signs provided along the route.

Here are some tips to ensure road safety in these conditions:

  • Respect temporary signs and the speed limit.

  • Be patient and maintain a safe distance from vehicles in front.

  • Use signalling devices in the event of prolonged stops.

  • Pay attention to the behaviour of construction workers and temporary traffic lights.

It is essential to follow these instructions to ensure safe and smooth transit during the work period.



(source: cciss ; image for illustrative or stock purposes only)