Please note that on the SS639 Dei Laghi di Pusiano e di Garlate there is an one-way system due to work in progress. This situation will continue from 09:00 on 7 November 2024 until 17:00 on 7 December 2024.

The work will take place between the Erba Crossroads and the Pusiano Crossroads, and could cause slowdowns and possible traffic disruption. Motorists are advised to pay particular attention to the signs present and to respect the instructions provided by the construction sites.

Information summary:

  • Affected section: SS639 Dei Laghi di Pusiano e di Garlate
  • Type of intervention: work in progress
  • Current situation: one-way traffic
  • Start date and time: from 09:00 on 7 November 2024
  • End date and time: at 17:00 on 7 December 2024
  • Location: between Incrocio Erba and Incrocio Pusiano

It is recommended to plan alternative routes if possible and to allow for longer travel times during this period. Road safety is essential; Driving carefully and following the signs is essential.



(source: cciss ; image for illustrative or stock purposes only)