Maintenance work is underway on the SS27 Del Gran San Bernardo, a significant stretch for the connection between Italy and Switzerland. The restoration operations are being carried out 394 meters after the intersection with Etroubles and 939 meters before the intersection with Cerisey, near the Gran San Bernardo Tunnel.

All motorists are advised to pay particular attention to road signs and to adopt prudent driving behaviors to ensure their own safety and that of others.

Traffic conditions may change due to the works, so it is recommended to plan alternative routes.

Work details:

  • Location: SS27 Del Gran San Bernardo
  • Sections affected:
  • 394 m after Etroubles intersection
  • 939 m before Cerisey intersection
  • Type of intervention: Maintenance work
  • Impacts: Possible slowdowns and partial closures

It is advisable to stay updated via official traffic channels for further information.



(source: cciss ; image for illustrative or stock purposes only)