Between 21 October 2023 and 21 November 2024, on the SS195 Sulcitana a lane reduction is reported due to roadworks. This situation will affect the stretch between the Teulada Crossroads and the S. Margherita Crossroads.

All motorists are advised to pay particular attention to the signs present on site and to moderate their speed to ensure everyone's safety.

Information summary:

  • Road affected: SS195 Sulcitana
  • Origin: between Teulada Crossroads and S. Margherita Crossroads
  • Type of intervention: lane reduction
  • Period of work: from 21 October 2023 to 21 November 2024
  • Intervention times: from 08:00 to 23:59

It is recommended to follow the indications of the road operators and to plan any alternative routes to reduce the inconvenience during the period of works.



(source: cciss ; image for illustrative or stock purposes)