On the SS106 Jonica a lane reduction is underway due to a landslide. This intervention affects the section between the Badolato Marina Crossroads and the Marina Di Davoli Crossroads.
The lane reduction operation is scheduled from 06:00 on 18 September 2024 until 23:59 on 1 September 2025. Drivers are advised to pay attention and obey diversion signs and directions provided along the route.
To ensure maximum road safety it is advisable to:
- Always stay in the marked lanes
- Reduce speed when approaching the work zone
- Pay particular attention to the instructions of road operators
All road users are advised to plan their journey taking into account possible delays and to consider alternative routes when possible.
Intervention details:
- Affected section: SS106 Jonica
- Carriageway reduction: yes
- Intervention period: from 18 September 2024 to 1 September 2025
- Location: between Incrocio Badolato Marina and Incrocio Marina Di Davoli
Please share this information to help raise awareness of the road situation.
(source: cciss ; image for illustrative or stock purposes)