On the SS27 Gran San Bernardo, work is currently underway on the stretch between 7.629 km after the Gignod intersection and 720 meters before the Fine Variante di Etroubles intersection.

All motorists are advised to pay maximum attention to temporary signs and to respect the speed limits imposed in the area. The works could cause traffic delays and diversions, so it is advisable to plan your journey in advance, considering alternative routes where possible.

Details

  • Road: SS27 Gran San Bernardo
  • Section affected:
  • 7.629 km after the Gignod junction
  • 720 metres before the Fine Variante di Etroubles junction
  • Type of work: Work in progress
  • Recommendations:
  • Pay attention to signs
  • Respect speed limits
  • Plan alternative routes

We urge everyone to travel with caution and follow the instructions provided by the competent authorities to ensure the safety safety of all on the road.



(source: cciss ; image for illustrative or stock purposes only)