Work is about to begin along the SS18 Tirrena Inferiore, which will involve an one-way system. This change to traffic will be in effect from 7:00 on 7 October to 18:00 on 10 October 2024. The affected section is between the Battipaglia - SS19 Delle Calabrie intersection and the Variante Di Ponte Barizzo intersection.
It is important to pay attention and respect road signs and operator instructions to ensure the safety of all road users.
Summary of structured information:
- Location: SS18 Tirrena Inferiore
- Activity: Work in progress
- Direction of traffic: One-way traffic
- Period of validity: From 7 October 2024, 07:00, until 10 October 2024, 18:00
- Section affected: Between Incrocio Battipaglia - SS19 Delle Calabrie and Incrocio Variante Di Ponte Barizzo
Motorists are advised to plan their itineraries considering possible inconveniences and delays. It is recommended to keep a safe distance and drive carefully near the construction site.
(source: cciss ; image for illustrative or stock purposes)